天博体育登录

EN
CN EN

Construction Machinery

Home - Solutions - Flexibility of Heavy Truck Assembly Line - Flexibility of Heavy Truck Assembly Line

Flexibility of Heavy Truck Assembly Line

A construction machinery group's heavy-duty truck production assembly line flexible transformation project, the project canceled the original board surface line and supporting construction, invested dozens of 10T load AGV, SPS material transportation sub-assembly AGV, multiple sets of automatic charging stations, and AGV Management system. The customer reduced the construction cost, and at the same time realized the flexible assembly of the factory, the SPS conveying of the material on the line, and the timely distribution. The project improves production efficiency by nearly 30%, and finally realizes production cycle management, information management, and visual management.

The project realized the first domestic case of single-car AGV carrying a frame to realize transfer and assembly, and the first domestic case of truck factory to realize SPS transportation and subassembly.

Classic cases